[BITList] Engineering Question?

John Feltham wantok at me.com
Mon Dec 23 04:28:12 GMT 2013



Trans-Canada Highway in Alberta . The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing.



Solve:
When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half?
(Assume no effect for head wind and no braking by the driver)











I couldn't solve it either...but who cares; the pictures are great!

P.S. The driver was on his mobile phone...



ooroo

The palest ink is more reliable than the strongest memory.

Chinese Proverb.




-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20131223/e6518551/attachment-0001.htm 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: mime-attachment11.jpg
Type: image/jpg
Size: 60667 bytes
Desc: not available
Url : http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20131223/e6518551/attachment-0003.jpg 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: mime-attachment22.jpg
Type: image/jpg
Size: 39644 bytes
Desc: not available
Url : http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20131223/e6518551/attachment-0004.jpg 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: mime-attachment33.jpg
Type: image/jpg
Size: 81753 bytes
Desc: not available
Url : http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20131223/e6518551/attachment-0005.jpg 


More information about the BITList mailing list