[BITList] ngineering Question

John Feltham wantok at me.com
Wed Aug 31 11:16:21 BST 2011





Engineering Question
  

 
Conditions:
A digger weighing 22 tons is on top of a trailer and heading east on the Trans-Canada Highway near High River, Alberta. The extended shovel arm is made of hardened refined steel and the approaching overpass is made of commercial-grade concrete, reinforced with 1 inch steel rebar spaced at 6 inch intervals in a criss-cross pattern layered at 1 foot vertical spacing.

 
Solve:
When the shovel arm hits the overpass, how fast do you have to be going to slice the bridge in half? (Assume no effect for headwind and no braking by the driver.)

 

 







I couldn't solve it either...but who cares; the pictures are great!

P.S. The driver was on his mobile...


  
 

 
-------------- next part --------------
An HTML attachment was scrubbed...
URL: http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20110831/901aa6c2/attachment-0001.shtml 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image001.jpg
Type: image/jpeg
Size: 60667 bytes
Desc: not available
Url : http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20110831/901aa6c2/attachment-0003.jpg 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image002.jpg
Type: image/jpeg
Size: 39644 bytes
Desc: not available
Url : http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20110831/901aa6c2/attachment-0004.jpg 
-------------- next part --------------
A non-text attachment was scrubbed...
Name: image003.jpg
Type: image/jpeg
Size: 81753 bytes
Desc: not available
Url : http://lists.bcn.mythic-beasts.com/pipermail/bitlist/attachments/20110831/901aa6c2/attachment-0005.jpg 


More information about the BITList mailing list